This project is in Woluwe-Saint-Pierre. Il consists in the realization of a block of offices, a warehouse, and a catering space for the company personnel.
The project has been subject of an in-depth study aiming to achieve the passive standard for the office area while the warehouse will respond to low-energy standard.
Added to optimal performance of the building envelope, the following renewable energy systems are incorporated into the project:
Energy performance characteristics:
Units
Requested requirements offices-services
Achieved requested offices-services
Sealing test (NBN EN 13829)
Annual heating needs
Bureau of study’s appointments:
HVAC:
Heating by geothermal heat pump and condensing boiler, domestic hot water heating by thermal solar panels, office cooling and heating using active false improving the building inertia, double flow ventilation with energy recovery.
Sanitary:
Sanitary installation, rainwater recovery and treatment, hot and cold-water supply, wastewater drainage, sanitary appliances.
Electricity:
Strong and weak electrical flow study. Very high efficiency lighting and low luminance, diming, and low electromotive forces.
Fire detection, intrusion detection, cameras surveillance, access control and so on…
Boomerang Core Company
Jean-Michel DE HAAN
Democo
5,250,000 €
3,000 m²